GHN Group logo inverted

Another ghn Group Project

Road 92 Reconstruction
Project Owner: Township of Zorra

Project overview

Complete road reconstruction of Road 92 in Lakeside, ON, including regrading of roadway and ditches for safer sight distances and improved drainage. Remove and replace of storm sewers and installation of 400mm dia. twin culvert road crossing.

Township of Zorra logo
b3lineicon|b3icon-map-location||Map Location

LOCATION

Road 92
Zorra Ontario

b3lineicon|b3icon-file-text||File Text

SCOPE

  • Storm Sewers (150mm to 450mm dia.) 300m 
  • Granular Base 28000 tonnes
  • Base and Surface Asphalt 2500 tonnes
b3lineicon|b3icon-university||University

VALUE

1,000,000