Buckingham Estates Phase 1A Earthworks
Project Owner: Buckingham Estates Ontario Ltd.

Project overview

Strip and stockpile 30000m3 of topsoil and complete onsite cut to fill of 60000m3 including construction of a SWM Pond with storm inlets and outlets.

buckingham_estates_logo_2
b3lineicon|b3icon-map-location||Map Location

LOCATION

70 Church Street
Exeter, Ontario

b3lineicon|b3icon-file-text||File Text

SCOPE

  • Strip and stockpile onsite 30000m3
  • Onsite cut to fill 60000m3
  • Storm Sewers (200 to 1050mm dia.) 235m – SWM Pond Facility construction
  • Granular Base 3000 tonnes
  • Surface asphalt 150 tonnes
b3lineicon|b3icon-university||University

VALUE

1,100,000