Another ghn Group Project

Thames Spring West Phase 1
Project Owner: Mimadala Holdings Inc.

Project overview

Complete earthworks and import of granular for Thames Springs West Phase 1 Subdivision, including installation of sanitary and storm sewers, watermain, service connections for 76 lots and full depth road construction to base asphalt. Modification of existing SWM Pond including the installation of 21,000m2 infiltration gallery and multiple headwalls.

b3lineicon|b3icon-map-location||Map Location

LOCATION

154889 15th Line
Thamesford Ontario

b3lineicon|b3icon-file-text||File Text

SCOPE

  • Topsoil strip and stockpile 20000m3
  • Onsite cut to fill 30000m3
  • Sanitary sewers (200mm dia.) 810m
  • Storm sewers (300 to 600mm dia.) 1150m
  • Watermain (150mm and 200mm dia.) 900m
  • Road Construction 820 m
  • Granular Base (Roads) 11000 tonnes
  • Granular Base (Lots/ROW) 100000 tonnes
  • Base Asphalt 875 tonnes
  • Curb Construction 1640m
b3lineicon|b3icon-university||University

VALUE

4,000,000